|
|
Methodology of Survey – Setting out and Layout
» The Survey shall be carried out using high precision instruments such as Electronic Total Station.
» Location of proposed Road and Railway alignments, layouts and Industrial/Building Structures Shall be set out based on reference points/pillars already fixed during initial Topographical survey.
» The consultants after the design for the proposal shall provide us the points to be located Along with its coordinates or respective bearing and distance.
» Points to be located shall be staked out up to an accuracy of 1mm depending on the purpose.
» 3D Setting out shall also be carried our when the elevation is also to be considered while locating the points, for Bridges & Flyovers, Dams & Irrigation structures, Railway & MRTS. |
|